Skip to main content
Skip table of contents

Tracking of manual downloads

Delivery list counters now show ’2 of 5 / 2 ‘ which mean the 2 end points were delivered out of 5 and there are 2 ‘extra’ actions for Pull Receipt.

Extra actions can also be Manual download from the site, AS2 delivery and LAN to LAN delivery.

For FTP/ SFTP clients ‘Pull Receipt’ was changed to happen on download, not on ‘File Delete’.

This means then there can be multiple pull receipts and all of them are tracked.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.