Tracking of manual downloads

Delivery list counters now show ’2 of 5 / 2 ‘ which mean the 2 end points were delivered out of 5 and there are 2 ‘extra’ actions for Pull Receipt.

Extra actions can also be Manual download from the site, AS2 delivery and LAN to LAN delivery.

For FTP/ SFTP clients ‘Pull Receipt’ was changed to happen on download, not on ‘File Delete’.

This means then there can be multiple pull receipts and all of them are tracked.